
| Parameter | Value |
|---|---|
| Orderable part number | 5.0SMDJ90A |
| Standoff voltage (VR) | 90 V |
| Leakage current at VR | 2 uA |
| Breakdown voltage at IT | 100 V to 111 V |
| Test current (IT) | 5 mA |
| Clamping voltage at IPP | 146 V |
| Peak pulse current | 34 A |
| Polarity | Unidirectional |
| Peak pulse power, 10/1000 us | 5000 W |
| Package | SMC (DO-214AB) |
| Mounting | Surface mount |
| Operating temperature | -55 °C to +150 °C |
| Qualification | Commercial grade |
| RoHS | Compliant, halogen free |
| Data sheet | Eaton Technical Data 11204 |
Outline drawing, pad or lead geometry and the pulse derating curves are
on the pages of Eaton Technical Data 11204; the package line above is the
body the part is built in.
The peak pulse power rating is a 10/1000 microsecond figure: a 400 W part takes 400 W for one millisecond, not continuously. Shorter pulses allow more current, longer ones less, which is what the derating curves in the data sheet show.
The breakdown window spans 11 percent, from 100 V to 111 V. Design against the minimum, because a part at the bottom of the window starts conducting first.
At 90 V standing the leakage is at most 2 uA, so the part draws 0.18 mW on the rail. Small, but it is the number that matters on a battery input.
Within the 5.0SMDJ family this is item 52 of 60 in the Eaton catalogue.
Place it on the protected side of any series impedance, not behind it. A TVS behind a common mode choke protects the choke, which is usually the opposite of what the design intends.
Does the peak pulse power rating apply to any surge?
No. It is quoted for a 10/1000 microsecond waveform. A shorter pulse allows more current and a longer one less; the derating curve converts between them.
How much capacitance does it add?
Enough to matter on a fast line. A 1500 W part can be several thousand picofarads, which is fine on a supply rail and not fine on a USB or Ethernet pair.
How do I pick the standoff voltage?
Above the highest steady-state voltage the line can reach, including regulation, ripple and any temporary overvoltage the standard requires. Then check that the minimum breakdown voltage is still above that level, because production spread moves it down.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd