
| Parameter | Value |
|---|---|
| Orderable part number | AK6-058C |
| Standoff voltage (VR) | 58 V |
| Leakage current at VR | 10 uA |
| Breakdown voltage at IT | 64 V to 70 V |
| Test current (IT) | 10 mA |
| Clamping voltage at IPP | 110 V |
| Peak pulse current | 6000 A |
| Polarity | Bidirectional |
| Package | Axial leaded |
| Mounting | Through-hole |
| Operating temperature | -55 °C to +125 °C |
| Qualification | Commercial grade |
| RoHS | Compliant, halogen free |
| Data sheet | Eaton Technical Data 11209 |
Outline drawing, pad or lead geometry and the pulse derating curves are
on the pages of Eaton Technical Data 11209; the package line above is the
body the part is built in.
These parts are avalanching junctions, so they clamp harder than a varistor and recover without the voltage drift a metal oxide part shows after a surge. The trade is capacitance and a sharper failure mode.
The breakdown window spans 9.375 percent, from 64 V to 70 V. Design against the minimum, because a part at the bottom of the window starts conducting first.
At 58 V standing the leakage is at most 10 uA, so the part draws 0.58 mW on the rail. Small, but it is the number that matters on a battery input.
Within the AK6 family this is item 6 of 17 in the Eaton catalogue.
The part goes across the line after the fuse, with the return path as short as the layout allows. Every centimetre of trace between the connector and the diode adds inductance, and the clamp the circuit sees is the diode clamp plus L di/dt.
How much capacitance does it add?
Enough to matter on a fast line. A 1500 W part can be several thousand picofarads, which is fine on a supply rail and not fine on a USB or Ethernet pair.
What happens if the surge exceeds the rating?
The junction overheats and fails short, which then puts the full fault current through the board. That is why a fuse ahead of the suppressor is part of the protection, not an optional extra.
How do I pick the standoff voltage?
Above the highest steady-state voltage the line can reach, including regulation, ripple and any temporary overvoltage the standard requires. Then check that the minimum breakdown voltage is still above that level, because production spread moves it down.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd