
| Parameter | Rating |
|---|---|
| Parameter | Value |
| Manufacturer / Series | Littelfuse / TE UMF 804 |
| Part number | 80414000000 |
| Fuse characteristic | TT Time-Lag |
| Rated current | 4 A |
| Rated voltage | 250 VAC |
| Interrupting capability | 150 A @ 250 VAC |
| Package | TE Universal Modular Fuse (UMF), radial; Long leads; Tape & Ammopack |
| Mounting method | Through Hole, Radial |
| Dimensions | TE5-class subminiature radial body; lead Ø0.6 mm |
| Lead pitch | 5.08 mm |
| Operating temperature | -40°C to +125°C |
| Approvals | UL E242325; VDE 40029388; CQC; KC; CE/UKCA; PSE |
| Standards / compliance | IEC 60127-1 & 60127-4; EN 60127-1 & 60127-7; GB 9364.1/.4; J/K 60127; UL E242325; VDE; CQC; PSE/KC |
| Environmental | RoHS; lead-free; halogen-free |
| Nominal cold resistance | 0.0174 Ω |
| Nominal melting I²t | 368 A²s |
| Packaging / order code | 0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm |
| Product status | Verify current orderability with Littelfuse / authorized distribution |
Engineers usually specify it for these duties:
Order code 80414000000 from Littelfuse, supplied in TE Universal Modular Fuse (UMF), radial; Long leads; Tape & Ammopack. Confirm the exact suffix before release.
What are the ratings of the 80414000000?
4 A continuous at 250 VAC, interrupting rating 150 A @ 250 VAC.
Can the 80414000000 be used on a higher fault-current circuit?
No — its interrupting rating is 150 A @ 250 VAC. Choose a part whose breaking capacity exceeds the prospective fault current.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd