
| Parameter | Rating |
|---|---|
| Parameter | Value |
| Manufacturer / Series | Littelfuse / TE5® 392 |
| Part number | 39211000000 |
| Fuse characteristic | Slo-Blo® / Time-Lag (T) |
| Rated current | 1 A |
| Rated voltage | 250 VAC |
| Interrupting capability | 35 A @ 250 VAC (IEC); 130 A @ 250 VAC (UL) |
| Package | TE5® radial box fuse; Long leads; Tape & Ammopack |
| Mounting method | Through Hole, Radial |
| Dimensions | 8.5 × 4.0 × 8.0 mm max; lead Ø0.6 mm |
| Lead pitch | 5.08 mm |
| Operating temperature | -40°C to +125°C |
| Approvals | VDE 126983; cRUus E67006; CE; CCC; KC; PSE |
| Standards / compliance | IEC/EN/J/K 60127-1 & 60127-3; UL/CSA/NMX 248-1 & 248-14; VDE; cRUus; CE; CCC/KC/PSE (rating-dependent) |
| Environmental | RoHS; lead-free; halogen-free; red-phosphorus-free |
| Nominal cold resistance | 0.0715 Ω |
| Nominal melting I²t | 8 A²s |
| Packaging / order code | 0000: Tape & Ammopack, 1,400 pcs; Long leads; lead length 18.8 mm |
| Product status | Verify current orderability with Littelfuse / authorized distribution |
Order code 39211000000 from Littelfuse, supplied in TE5® radial box fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.
What are the ratings of the 39211000000?
1 A continuous at 250 VAC, interrupting rating 35 A @ 250 VAC (IEC); 130 A @ 250 VAC (UL).
Can the 39211000000 be used on a higher fault-current circuit?
No — its interrupting rating is 35 A @ 250 VAC (IEC); 130 A @ 250 VAC (UL). Choose a part whose breaking capacity exceeds the prospective fault current.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd