Littelfuse TE5® 392 39214000000 | 4 A 250 VAC Fuse | Long leads | 1,400 pcs
Littelfuse TE5® 392 39214000000 | 4 A 250 VAC Fuse | Long leads | 1,400 pcs

Littelfuse TE5® 392 39214000000 | 4 A 250 VAC Fuse | Long leads | 1,400 pcs

Share
pLittelfuse 39214000000 — 4 A, 250 V, fuse, 40 A @ 250 VAC (IEC); 50 A @ 250 VAC (UL) interrupting./p
    • Product Details
    • Download

    Littelfuse TE5® 392 39214000000 | 4 A 250 VAC Fuse | Long leads | 1,400 pcs

    The 39214000000 from Littelfuse carries 4 A, rated 250 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TE5® 392
    Part number39214000000
    Fuse characteristicSlo-Blo® / Time-Lag (T)
    Rated current4 A
    Rated voltage250 VAC
    Interrupting capability40 A @ 250 VAC (IEC); 50 A @ 250 VAC (UL)
    PackageTE5® radial box fuse; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    Dimensions8.5 × 4.0 × 8.0 mm max; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +125°C
    ApprovalsVDE 126983; cRUus E67006; CE; CCC; KC; PSE
    Standards / complianceIEC/EN/J/K 60127-1 & 60127-3; UL/CSA/NMX 248-1 & 248-14; VDE; cRUus; CE; CCC/KC/PSE (rating-dependent)
    EnvironmentalRoHS; lead-free; halogen-free; red-phosphorus-free
    Nominal cold resistance0.0128 Ω
    Nominal melting I²t126.4 A²s
    Packaging / order code0000: Tape & Ammopack, 1,400 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Practical Notes

    • Interrupting capability is 40 A @ 250 VAC (IEC); 50 A @ 250 VAC (UL) — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 250 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 4 A to stop nuisance trips — fix the cause instead.

    Buying Notes

    Order code 39214000000 from Littelfuse, supplied in TE5® radial box fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Questions and Answers

    What are the ratings of the 39214000000?

    4 A continuous at 250 VAC, interrupting rating 40 A @ 250 VAC (IEC); 50 A @ 250 VAC (UL).

    Can the 39214000000 be used on a higher fault-current circuit?

    No — its interrupting rating is 40 A @ 250 VAC (IEC); 50 A @ 250 VAC (UL). Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message

    Shenzhen Gaorunxin Technology Co., Ltd

    Related Products