
| Parameter | Rating |
|---|---|
| Parameter | Value |
| Manufacturer / Series | Littelfuse / TR5® 383 |
| Part number | 38311250000 |
| Fuse characteristic | Slo-Blo® / Time-Lag (T) |
| Rated current | 1.25 A |
| Rated voltage | 300 VAC |
| Interrupting capability | Rating-dependent; up to 100 A (300/320/250 VAC per datasheet) |
| Package | TR5® radial lead fuse; Long leads; Tape & Ammopack |
| Mounting method | Through Hole, Radial |
| Dimensions | Ø8.5 mm × 8.0 mm max; lead Ø0.6 mm |
| Lead pitch | 5.08 mm |
| Operating temperature | -40°C to +85°C |
| Approvals | cRUus E67006; PSE; CE |
| Standards / compliance | IEC 60127-3; UL/CSA/NMX 248-1 & 248-14; cRUus E67006; PSE; CE; VDE 4–5A |
| Environmental | RoHS; lead-free; halogen-free |
| Nominal cold resistance | 0.05 Ω |
| Nominal melting I²t | 6.88 A²s |
| Packaging / order code | 0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm |
| Product status | Verify current orderability with Littelfuse / authorized distribution |
Typical places this fuse turns up:
Order code 38311250000 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.
What are the ratings of the 38311250000?
1.25 A continuous at 300 VAC, interrupting rating Rating-dependent; up to 100 A (300/320/250 VAC per datasheet).
Can the 38311250000 be used on a higher fault-current circuit?
No — its interrupting rating is Rating-dependent; up to 100 A (300/320/250 VAC per datasheet). Choose a part whose breaking capacity exceeds the prospective fault current.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd