At a Glance
- When earth leakage is detected, OS pin outputs a high pulse at least 30ms
- Detector earth leakage include type AC
- Good input sensitivity for different type of earth leakage
- High noise protection against EMC
The FMSH VG54123A is an analog ic. The VG54123A is a semiconductor integrated circuit which is used as an earth leakage protection, which comprises voltage regulator, amplifier, comparator, controller and driver.
Key Specifications
| Trip Voltage | 5mVrms |
| Delay Time | 28 ms |
Features
- When earth leakage is detected, OS pin outputs a high pulse at least 30ms
- Detector earth leakage include type AC
- Good input sensitivity for different type of earth leakage
- High noise protection against EMC
- Apply to 110V~220V(50Hz~60Hz) AC power supply
Design Notes
- The trip threshold is specified over a tolerance band, not at a single point. Design the sense resistor against the worst-case ends of that band, or nuisance tripping will appear at temperature extremes.
- These circuits are usually supplied from a capacitive dropper or a resistive divider off the mains. Verify the supply current budget against the datasheet before adding load.
- Package choice drives creepage. For mains-referenced parts, use the widest package the layout allows and keep the specified clearance to the low-voltage side.
- Check the temperature coefficient of the threshold if the product must hold accuracy over an outdoor temperature range.
Common Questions
What is the trip threshold?
the threshold above. The threshold is specified over a tolerance band, so size the sense element against the band ends rather than the typical value.
What does this device do?
the function described above. It integrates the control loop that would otherwise need a board of discrete parts.
Which packages are offered?
the package listed above. For mains-referenced circuits choose the package that meets the creepage requirement of the layout.
How is it powered?
Typically from a capacitive dropper or resistive divider off the mains rail. Check the supply current budget in the datasheet before adding any load to that rail.